Information in this section includes a description of PCS Axis fields. Fields that include Activate in the field name share the same description as their counterpart, such as Activate AC Power and AC Power. The Activate AC Power field must be added in the Information grid to enter data in the AC Power field in the Inspections grid.
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > AC CIS.
|
|
|
|
|
|
Manufacturer of the rectifier being installed. See CPDM module, Data Entry > Edit CPDM Data > Rectifier Inspections grid > Customize > Layouts.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit Indirect Survey Data > ACVG grid.
|
|
|
|
Leak location. See LSM, Data Entry > Edit LSM Data > Maintenance grid > Customize > Layouts.
|
|
|
|
|
|
When adjusting the bond current (1) click the Bond Current Adjusted check box; (2) enter the pre-adjusted value (in amps) in the field Bond Current Found; and then (3) enter the adjusted value (in amps) in the field Bond Current Left. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information and Inspection grid > Customize > Layouts.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description of coating condition. See ACM, Data Entry > Edit ACM Data > Inspection grid > Customize > Layouts.
|
|
Type of coke breeze, such as metallurgical and petroleum-based. See CPDM, Data Entry > Edit CPDM Data > Rectifier Information, Inspection, or Maintenance grid > Customize > Layouts.
|
|
See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layout.
|
|
See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information, Inspection, or Maintenance grids > Customize > Layouts.
|
|
See ISM module, Data Entry > Edit ISM Data > Soil Resistivity.
|
|
See VM, Data Entry > Edit VM Data > Information or Inspection grid > Customize > Layouts.
|
|
See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information grid > Customize > Layouts.
|
|
See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layouts.
|
|
See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information, Inspection, or Maintenance grid > Customize > Layouts.
|
|
|
|
|
|
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
|
|
See ISM, Data Entry > Edit ISM Data > ACVG.
|
|
Default Location Format is available in all modules. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layout.
|
|
See ISM, Data Entry > Edit ISM Data > ACCA.
|
|
Distance from wall to wall across a tank. See CPDM, Data Entry > Edit CPDM Data > Tank Information, Inspection or Maintenance grid > Customize > Layouts.
|
|
Amperage rating of the diode in the rectifier. See CPDM, Data Entry > Edit CPDM Data > Information or Inspection grid > Customize > Layout.
|
|
Date a facility is scheduled for survey based on settings in Edit Schedule Settings (Data Entry > Edit Schedule Settings). This field is available for use in all modules; add the field in either the Information or Inspection grid.
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
|
|
Read-only field showing the date a facility is due for inspection based on scheduling properties set up in Edit Schedule Settings (Data Entry > Edit Schedule Settings). This field is available in all modules. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layout.
|
|
|
|
|
|
|
|
|
|
|
|
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
|
|
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layout.
|
|
See CPDM, Data Entry > Edit CPDM Data > Information or Inspection grid > Customize > Layouts.
|
|
See CPDM, Data Entry > Edit CPDM Data > Information or Inspection grid > Customize > Layouts.
|
|
|
|
Date a facility is considered to be past due for inspection. This is a PCS Axis calculated field based on schedule settings set up in Edit Schedule Settings (Data Entry > Edit Schedule Settings). Available for use in all modules; add the field in either the Information or Inspection grid. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Maximum and minimum current output. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
|
|
Rectifier facilities: Number of impressed current anodes at a rectifier/ground bed installation. If there are multiple ground beds at a rectifier, this will be the total number of anodes associated with that rectifier.
Galvanic Anodes: Number of sacrificial anodes at a galvanic anode installation.
See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
|
|
|
|
See ISM module, Data Entry > Edit ISM Data > ACVG.
|
|
Use this field to classify or prioritize the severity of an indication. For example, classifications such as minor, moderate, severe, immediate, scheduled, or monitored might be used to prioritize the severity of indications. Typical indications include coating faults, holidays, corrosion activity, electrical shorts, interference, geologic current shielding, and other types of anomalies that have been discovered during an above ground, indirect survey.
|
|
|
|
|
|
|
|
|
|
See CPDM, Data Entry > Edit CPDM Data > Test Point > Information or Inspection grid > Customize > Layouts.
|
|
See ISM, Data Entry > Edit ISM Data > DCVG.
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > ACCA.
|
|
|
|
See ISM, Data Entry > Edit ISM Data > ACCA.
|
|
|
|
See ISM, Data Entry > Edit ISM Data > ACCA.
|
|
See Tools > Customize > General > User Location Name.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > Survey Maintenance.
|
|
See ISM, Data Entry > Edit ISM Data > DCVG.
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > ACCA.
|
|
See ISM, Data Entry > Edit ISM Data > Pearson.
|
|
|
|
Year a periodic survey is performed. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Inspection grid > Customize > Layouts.
|
|
|
|
Phone number of the person to contact at another company about a foreign bond. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond > Information or Inspection grid > Customize > Layouts.
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > any survey type.
|
|
See CPDM, Data Entry > Edit CPDM Data > Foreign Bond > Information and Inspection grid > Customize > Layouts.
|
|
Phone number of the power company for a rectifier installation site. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grid > Customize > Layouts.
|
|
Pipe-to-soil reading taken before installation of galvanic anodes. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grid > Customize > Layouts.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note: PCS Axis multiplies the initial rectifier reading by the rectifier shunt factor when the fields Rated Rectifier Output Volts and Rated Rectifier Output Current are populated in the Rectifiers Information grid.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > DCVG.
|
|
See ISM, Data Entry > Edit ISM Data > Soil Resistivity.
|
|
See CPDM, Data Entry > Edit CPDM Data > Tank > Information and Inspection grids > Customize > Layouts.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See ISM, Data Entry > Edit ISM Data > CIS.
In CPDM, add and enable Activate Structure IRF in the Test Point Information grid to allow data entry in the Inspections grid.
|
|
See ISM, Data Entry > Edit ISM Data > CIS.
In CPDM, add and enable the field Activate Structure P/S in the Test Point Information grid to allow data entry in the Inspections grid.
|
|
Total length and width of the pipeline expressed in feet. This field is used to determine Efficiency in the Current Density report. See any module > Data Entry > Edit ROW Detail.
|
|
|
|
Type of coating or covering on the pipeline. See LSM, Data Entry > Edit LSM Data > Maintenance grid > Customize > Layouts.
|
|
|
|
|
|
Identifies the survey folder a survey reading is assigned to. Field is available for use in all modules. See Data Entry > Edit <module> Data > Inspection grid > Customize > Layouts. For periodic survey readings in CPDM, use the fields Periodic Survey and Periodic Survey Year instead.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type of valve such as block or plug. See VM, Data Entry > Edit VM Data > Information or Inspection grid > Customize > Layouts.
|
|
|