System Field Descriptions

System Field Descriptions
Information in this section includes a description of PCS Axis fields. Fields that include Activate in the field name share the same description as their counterpart, such as Activate AC Power and AC Power. The Activate AC Power field must be added in the Information grid to enter data in the AC Power field in the Inspections grid.
Note: The menu path included in some field descriptions may include the placeholder text <module>, such as Data Entry > Edit <module> Data. The placeholder text indicates the field description applies to more than one module, such as CPDM, VM, ACM, ICM, or LSM.
 
Alternating Current Input. Voltage coming into the rectifier from a power source. See CPDM module, Data Entry > Edit CPDM Data > Rectifier Information grid > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > AC CIS.
Manufacturer of the rectifier being installed. See CPDM module, Data Entry > Edit CPDM Data > Rectifier Inspections grid > Customize > Layouts.
Power company account number. Can also be the customer’s account number for gas service. See CPDM module, Data Entry > Edit CPDM Data > Rectifier Inspections grid > Customize > Layouts.
See ISM, Data Entry > Edit Indirect Survey Data > ACVG grid.
Leak location. See LSM, Data Entry > Edit LSM Data > Maintenance grid > Customize > Layouts.
When adjusting the bond current (1) click the Bond Current Adjusted check box; (2) enter the pre-adjusted value (in amps) in the field Bond Current Found; and then (3) enter the adjusted value (in amps) in the field Bond Current Left. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information and Inspection grid > Customize > Layouts.
Shunt size measured in millivolts and Amps (mV/A). Add the field in either the Foreign Bond Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information and Inspection grid > Customize > Layouts.
Shunt resistance measured in Ohms. Add the field in either the Foreign Bond Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information and Inspection grid > Customize > Layouts.
Type of bond, such as resistance or direct. Add the field in either the Bond Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information and Inspection grid > Customize > Layouts.
Description of coating condition. See ACM, Data Entry > Edit ACM Data > Inspection grid > Customize > Layouts.
Type of coke breeze, such as metallurgical and petroleum-based. See CPDM, Data Entry > Edit CPDM Data > Rectifier Information, Inspection, or Maintenance grid > Customize > Layouts.
See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layout.
See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information, Inspection, or Maintenance grids > Customize > Layouts.
See ISM module, Data Entry > Edit ISM Data > Soil Resistivity.
See VM, Data Entry > Edit VM Data > Information or Inspection grid > Customize > Layouts.
See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information grid > Customize > Layouts.
See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layouts.
See CPDM, Data Entry > Edit CPDM Data > Foreign Bond Information, Inspection, or Maintenance grid > Customize > Layouts.
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > ACVG.
Read-only field showing the format used in numbering facilities on a pipeline segment. Default Location Format is set up before adding or linking facilities to a pipeline segment. Valid entries are: Metric Milepost, Milepost (4 decimals), Location ID, Milepost (3 decimals), Miles/Station Number, Reading Number, and Station Number.
Default Location Format is available in all modules. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layout.
See ISM, Data Entry > Edit ISM Data > ACCA.
Distance from wall to wall across a tank. See CPDM, Data Entry > Edit CPDM Data > Tank Information, Inspection or Maintenance grid > Customize > Layouts.
Amperage rating of the diode in the rectifier. See CPDM, Data Entry > Edit CPDM Data > Information or Inspection grid > Customize > Layout.
Date a facility is scheduled for survey based on settings in Edit Schedule Settings (Data Entry >Edit Schedule Settings). This field is available for use in all modules; add the field in either the Information or Inspection grid.
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
Read-only field showing the date a facility is due for inspection based on scheduling properties set up in Edit Schedule Settings (Data Entry > Edit Schedule Settings). This field is available in all modules. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layout.
Maximum and minimum voltage value allowed for data entry in the field East P/S in the Tank Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Tank > Information or Inspection grid > Customize > Layouts.
System-provided value that is calculated using the formula shown below. A value can be manually entered, but is not recommended. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grid > Customize > Layouts.
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layout.
See CPDM, Data Entry > Edit CPDM Data > Information or Inspection grid > Customize > Layouts.
See CPDM, Data Entry > Edit CPDM Data > Information or Inspection grid > Customize > Layouts.
Date a facility is considered to be past due for inspection. This is a PCS Axis calculated field based on schedule settings set up in Edit Schedule Settings (Data Entry > Edit Schedule Settings). Available for use in all modules; add the field in either the Information or Inspection grid. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
Add and enable Activate Foreign IRF in the Test Point Information grid to allow data entry in the Inspections grid. See CPDM, Data Entry > Edit CPDM Data > Test Point > Information and Inspection grids > Customize > Layouts.
Add and enable Activate Foreign P/S in the Test Point Information grid to allow data entry in the Inspections grid. See CPDM, Data Entry > Edit CPDM Data > Test Point > Information and Inspection grids > Customize > Layouts.
Add the fields Galvanic Anode Shunt Factor and Galvanic Anode Shunt Rating in either the Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
Weight in pounds (lbs) of sacrificial anode. Add this field in either the Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
Driving potential of the anode relative to the soil. Value entered in volts. Add this field in either the Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
Type of anode such as magnesium, aluminum, or zinc. Add this field in the Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
Maximum and minimum current output. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
Rectifier facilities: Number of impressed current anodes at a rectifier/ground bed installation. If there are multiple ground beds at a rectifier, this will be the total number of anodes associated with that rectifier.
Galvanic Anodes: Number of sacrificial anodes at a galvanic anode installation.
See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grids > Customize > Layouts.
See ISM module, Data Entry > Edit ISM Data > ACVG.
Add and enable Activate Insulator IRF in the Test Point Information grid to allow data entry in the Inspections grid. See CPDM, Data Entry > Edit CPDM Data > Test Point > Information and Inspection grids > Customize > Layouts.
Add and enable Activate Insulator P/S in the Test Point Information grid to allow data entry in the Inspections grid. See CPDM, Data Entry > Edit CPDM Data > Test Point > Information and Inspection grids > Customize > Layouts.
See CPDM, Data Entry > Edit CPDM Data > Test Point > Information or Inspection grid > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > DCVG.
See ISM, Data Entry > Edit ISM Data > ACCA.
Location Code is available for use in all modules and can be added in either the Information or Inspection grid. See Data Entry > Edit <module> Data > Information or Inspection grid > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > ACCA.
See ISM, Data Entry > Edit ISM Data > ACCA.
See Tools > Customize > General > User Location Name.
Amperage value of the negative shunt factor. This field is available in the Rectifier Negative Inspections mini-grid. See CPDM, Data Entry > Edit CPDM Data > Rectifier Inspections grid > Rectifier Negative Inspections mini-grid.
See ISM, Data Entry > Edit ISM Data > Survey Maintenance.
See ISM, Data Entry > Edit ISM Data > DCVG.
Two (2) pipelines within the same ROW (right-of way) and parallel to each other. Use the fields Pipeline Code and Pipeline Name in Select ROWs to identify a parallel pipeline. Also see Pipe, Pipeline Code, and Pipeline Name.
See ISM, Data Entry > Edit ISM Data > ACCA.
See ISM, Data Entry > Edit ISM Data > Pearson.
A survey conducted more often than every 12 months, such as monthly or bi-monthly rectifier surveys. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Inspection grid > Customize > Layouts.
Year a periodic survey is performed. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Inspection grid > Customize > Layouts.
Phone number of the person to contact at another company about a foreign bond. See CPDM, Data Entry > Edit CPDM Data > Foreign Bond > Information or Inspection grid > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > any survey type.
See CPDM, Data Entry > Edit CPDM Data > Foreign Bond > Information and Inspection grid > Customize > Layouts.
Phone number of the power company for a rectifier installation site. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grid > Customize > Layouts.
Pipe-to-soil reading taken before installation of galvanic anodes. See CPDM, Data Entry > Edit CPDM Data > Galvanic Anode > Information or Inspection grid > Customize > Layouts.
Dimensions of impressed current anodes such as 3 x 60. Add the field in either the Rectifier Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layouts.
Type of anode such as graphite or high silicon material. Add the field in either the Rectifier Information or Inspection grid. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layouts.
Note: PCS Axis multiplies the initial rectifier reading by the rectifier shunt factor when the fields Rated Rectifier Output Volts and Rated Rectifier Output Current are populated in the Rectifiers Information grid.
Maximum and minimum voltage value allowed for data entry in the field Rectifier Output Volts Found. See CPDM, Data Entry > Edit CPDM Data > Rectifier > Information or Inspection grids > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > DCVG.
See ISM, Data Entry > Edit ISM Data > Soil Resistivity.
See CPDM, Data Entry > Edit CPDM Data > Tank > Information and Inspection grids > Customize > Layouts.
See ISM, Data Entry > Edit ISM Data > CIS.
In CPDM, add and enable Activate Structure IRF in the Test Point Information grid to allow data entry in the Inspections grid.
See ISM, Data Entry > Edit ISM Data > CIS.
In CPDM, add and enable the field Activate Structure P/S in the Test Point Information grid to allow data entry in the Inspections grid.
Total length and width of the pipeline expressed in feet. This field is used to determine Efficiency in the Current Density report. See any module > Data Entry > Edit ROW Detail.
Surface condition of the pipeline. The field accepts up to five alphanumeric characters. See LSM, Data Entry > Edit LSM Data > Maintenance grid > Customize > Layouts.
Type of coating or covering on the pipeline. See LSM, Data Entry > Edit LSM Data > Maintenance grid > Customize > Layouts.
Identifies the survey folder a survey reading is assigned to. Field is available for use in all modules. See Data Entry > Edit <module> Data > Inspection grid > Customize > Layouts. For periodic survey readings in CPDM, use the fields Periodic Survey and Periodic Survey Year instead.
Type of valve such as block or plug. See VM, Data Entry > Edit VM Data > Information or Inspection grid > Customize > Layouts.