Use the field Bond Shunt Rating to enter the amps reading of the bond conversion shunt factor. Use the field
Bond Shunt Resistance to enter the millivolt (mV) reading of the bond conversion factor. Readings in both of these fields automatically update the field
Bond Shunt Factor.
Use the field Bond Current Found to enter the current reading for a foreign bond as it is found (before adjusting the current). The value automatically copies to the field
Bond Current Left. To adjust the
Bond Current Found reading, click the check box
Bond Current Adjusted and then type the adjusted reading in the field
Bond Current Left.